Booth Format

Modular Trade Show Booths at Long Beach Shows

Modular booths are the workhorse format for exhibitors who need a repeatable, reconfigurable structure that ships manageable freight, assembles without union tool restrictions at most venues, and scales from a 10x20 inline to a 20x20 island depending on what the show floor offers.

What planners need to confirm before committing to a modular booth at a Long Beach show

Booth footprint and aisle exposure — 10x10, 10x20, 20x20, or larger inline versus island configurations each carry different graphic coverage requirements, electrical run distances, and drayage weight estimates

Ceiling clearance and rigging rules at the specific hall or ballroom — LBCEC exhibit halls allow overhead rigging on certain structures; hotel ballroom programs at the Hyatt Regency and Westin impose lower ceiling limits and may prohibit hanging signs entirely

Electrical and AV jurisdiction — the Long Beach Convention & Entertainment Center's in-house services team handles electrical at the show floor level; AV may be handled separately depending on whether the show has an official contractor or an EAC arrangement

Advance shipment versus show-site delivery windows — sending modular crates to the marshalling yard ahead of the advance shipment deadline is almost always cheaper than show-site drayage, but the deadline is specific to each show's general contractor and is not set by the venue

Setup labor classification — whether the exhibitor's own staff can assemble modular components without calling union labor depends on the venue's labor agreement and the show's floor rules; some Long Beach shows allow exhibitor-installed systems up to a certain height

Modular booth formats and what fits in each footprint

The most common modular configurations at Long Beach shows follow a standard progression: 10x10 as the smallest inline unit, 10x20 for a double-wide inline, 20x20 as the entry-level island, and 20x30 or larger for island footprints that want structural presence without a full custom build. Each step up carries a proportional increase in crate count, setup time, and electrical demand. A 10x10 backwall with a monitor and two lights might ship in two to three cases; a 20x20 island with a monitor tower, header structure, and counter elements can run twelve to eighteen cases.

The distinction between inline and island changes more than square footage. An island footprint allows four-sided access, which changes how graphics are oriented and how traffic flows through the space. An inline footprint forces a single or double aisle exposure, so graphic hierarchy and electrical placement must accommodate directional visitor flow. Inline builds typically use a straight or curved backwall with wing panels; island builds use a perimeter frame with interior structures and, optionally, a center tower element.

Peninsula configurations sit between inline and island, with three-sided access and more visibility than a standard inline. Peninsula footprints at the Long Beach Convention Center often use a modular header extension that rises above neighboring inline booths. Confirm the permitted height with the show's floor plan before speccing that header, since adjacent inline booths may have their own height caps that affect the overall structure.

10x10 and 10x20 inline: two to five cases typical, one to two electrical circuits, single-face graphic orientation

20x20 island: four-sided access, eight to eighteen cases typical, two to four circuits, overhead structure permissible at LBCEC halls within published height limits

Peninsula (e.g., 10x20 with open back): three-sided access, header extension above neighboring inlines — confirm height limits in the show floor plan before ordering

Larger island footprints (20x30, 30x30): modular remains viable but freight and setup time approach custom-build territory; get a full case count and setup hour estimate before committing

Freight, crating, and drayage at LBCEC and Long Beach hotel venues

Modular systems ship in purpose-built cases for frame components, panel infills, and fabric graphics. Weight-per-case tends to be lighter than custom millwork booths, but case count is often higher for larger configurations. Drayage at the Long Beach Convention & Entertainment Center is billed by the hundredweight (CWT) by the show's official contractor, so the total cost is a function of gross weight, not case count. Ask the vendor for a weight manifest before finalizing the configuration so you can model costs against the show contractor's published rate card.

Advance shipment to the LBCEC marshalling yard is almost always the more economical path. The advance deadline varies by event and is set by the show's general contractor, commonly falling one to two weeks before the first move-in day. Material arriving after that cutoff is billed at a higher show-site drayage rate. For exhibitors shipping from Irvine, Carson, or other South Bay and Orange County locations, hitting the advance window requires coordinating with the carrier on a specific delivery day, not simply a week.

Hotel ballroom programs operate differently. The Hyatt Regency Long Beach, the Westin Long Beach, and the Marriott Long Beach Downtown all have loading dock access, but dock scheduling is tighter. Cases move from the dock to the ballroom via freight elevators, and hotels may restrict steel cart types or sizes. Confirm dock hours, elevator dimensions, and prohibited equipment with the hotel's events team before move-in day.

Drayage at LBCEC is billed by CWT (hundredweight), not case count — get a weight manifest before submitting

Advance shipment deadlines are show-specific; confirm with the official contractor, not with the venue

Hotel ballroom dock access is narrower than convention center marshalling; confirm elevator dimensions and cart restrictions in advance

Fabric graphic panels are lightweight but fragile — case construction matters; protect faces from dock handling

Electrical, AV, and rigging at Long Beach venues

At the Long Beach Convention & Entertainment Center, electrical service at the show floor is provided through the venue's in-house services team or the show's official contractor. Exhibitors order electrical through the show's exhibitor services kit, which specifies amperage options, outlet placement, and lead times. Modular booths with monitor towers, LED lighting tracks, and charging stations commonly need two 20-amp circuits for a 10x20 footprint and four or more for a 20x20 island. Order based on actual device load, not on a rough guess — undersized electrical orders are difficult and expensive to correct on move-in day.

AV integration at LBCEC depends on whether the show has designated AV as an official contractor service or left it open to EAC vendors. Most corporate shows allow exhibitors to bring their own AV under EAC rules, but EAC vendors need advance registration and must comply with any union jurisdictions covering rigging or electrical connections. Check EAC registration requirements from the show manual before your AV vendor starts planning.

Overhead rigging at LBCEC halls is available, but hanging signs and suspended elements require advance approval from the venue and the show's official contractor. Modular booth systems with hanging sign attachments should be identified in the initial booth spec so the rigging request can go into the show's ordering system during the advance window. Last-minute rigging requests are generally not accommodated, and self-rigging is not permitted regardless of how light the element is. Hotel ballroom programs do not accommodate overhead rigging for exhibit purposes; structures in hotel ballrooms must be self-supporting.

Order electrical based on actual device load, not booth size; two 20-amp circuits is typical for a 10x20 with monitors and lighting

AV under EAC rules requires advance vendor registration with the show — check the show manual early

Hanging signs at LBCEC halls require advance approval and go through the official rigging contractor, not the exhibitor

Hotel ballroom booths must be fully self-supporting; no overhead rigging for exhibits

Setup labor, exhibitor install rules, and what the show manual will say

A persistent mistake with modular booths is assuming that toolless assembly means any exhibitor staff can install the system anywhere. That assumption is often wrong at convention center shows with union labor agreements. The Long Beach Convention & Entertainment Center operates under a labor agreement governing what exhibitor personnel can do on the floor versus what must be performed by union labor, and the specific lines vary by show. The show's general contractor is the authoritative source, not the venue or the booth manufacturer.

Most Long Beach shows allow exhibitors to set up their own displays if the work can be done by one person working alone within a size threshold, often described as 'one person, one hour' or similar language. A 10x10 popup backwall and branded counter often clears that bar. A 20x20 island with a frame system, header element, monitor tower, and multiple panel graphics almost certainly does not. Know which category your booth falls into before assuming a field marketing coordinator can handle move-in without calling labor.

Strike rules mirror setup rules. The show's closing schedule sets a hard deadline for clearing material. Modular systems disassemble quickly relative to custom builds, but fabric graphics need to be rolled correctly to avoid damage, and all crates must be labeled and staged for marshalling pickup on the published schedule. Missing the strike window can result in the show contractor handling disassembly at a premium rate and billing it to the exhibitor.

Exhibitor self-install is often limited to small footprints that meet a 'one person, one hour' or similar threshold; check the specific show rules

20x20 island builds with multiple components almost always require show contractor or EAC labor, not unassisted exhibitor staff

Strike deadlines are firm; modular disassembly is fast but fabric handling and crate labeling take time, so build the strike window into the schedule

Confirm labor jurisdiction in the show manual before staffing move-in, not after the floor is already open

Briefing a modular booth vendor for a Long Beach show

Vendors need five inputs to give a useful quote: the venue and specific hall or ballroom, the booth footprint and configuration type (inline, peninsula, or island), the number of shows per year the system will travel, the case weight tolerance for the freight carrier, and the setup-labor plan. Leaving any of these vague produces a quote that won't survive contact with the show manual.

Graphics require a separate conversation. Tension fabric graphics are lighter, pack smaller, and tolerate more installations before showing wear. Rigid panel graphics are more durable under dock handling but add weight and case count. For hotel ballroom setups at the Hyatt Regency or Westin Long Beach where dock access is narrow, tension fabric is usually the practical choice. For a permanent island system running six or more shows per year, rigid panels may justify the freight weight.

Also specify the monitor mounting approach, the counter configuration, and whether the system needs lockable storage. Modular counters with lockable compartments are a different spec than open presentation counters, and the difference affects both the weight manifest and the AV cabling plan.

Venue and specific hall or ballroom, booth footprint and type, shows per year, case weight tolerance, and labor plan are the five non-negotiable brief inputs

Tension fabric graphics are lighter and pack smaller than rigid panels; better choice for tight hotel ballroom dock situations

Specify monitor mounting, counter lockability, and AV cabling paths in the initial brief — not during production

Multi-show rental versus purchase changes the cost math significantly; share the annual show count before evaluating quotes

Frequently asked questions about modular trade show booths at Long Beach shows

Can exhibitor staff assemble a modular booth at the Long Beach Convention & Entertainment Center without calling union labor?

It depends on the specific show's labor agreement and the booth's size and complexity. Many Long Beach shows allow exhibitors to set up their own displays if the work can be performed by one person working alone within a defined time and size threshold. A popup 10x10 backwall and a branded counter often qualify. A 20x20 island system with frame components, a header, and a monitor tower almost certainly does not. The authoritative source is the show's official contractor and the exhibitor rules section of the show manual, not the venue or the booth vendor.

How do I calculate drayage costs for a modular booth before the show?

Drayage at LBCEC is billed per hundredweight (CWT) by the show's official contractor, so the total cost depends on the gross shipped weight of all crates and cases. Ask your booth vendor for a weight manifest that lists each case, its dimensions, and its gross weight. Then apply the show contractor's published CWT rate, which is included in the exhibitor services kit distributed well before the show. Advance shipment rates are lower than show-site rates, so the advance deadline is also important; confirm it from the show manual and plan your outbound shipment date accordingly.

What is the maximum height for a modular booth at LBCEC exhibit halls?

Inline booths at most shows in the LBCEC halls are limited to eight feet in height. Island and peninsula booths typically can go higher, with the specific limit set in the show's floor plan and exhibitor rules. Some island footprints allow structures up to sixteen or twenty feet with prior approval. Hanging sign requests require a separate approval through the official rigging contractor and must be submitted during the advance ordering window, not at move-in. Confirm the height limit for your specific footprint from the show floor plan before speccing the booth.

Are modular booths allowed in Long Beach hotel ballrooms, and do the same rules apply?

Modular systems work in hotel ballrooms at the Hyatt Regency Long Beach, Westin Long Beach, and Marriott Long Beach Downtown, but the operational rules differ from the convention center floor. Hotel ballrooms do not permit overhead rigging for exhibit purposes, so all structures must be fully self-supporting. Ceiling clearances are lower than at the convention center. Dock access is narrower and must be scheduled in advance with the hotel's events team. Labor jurisdiction is set by the specific hotel and the event, not by the LBCEC's agreements, so confirm with the hotel before assuming the same rules apply.

Should I rent or buy a modular booth system for Long Beach shows?

For exhibitors who attend one or two shows per year and don't need identical setup across multiple markets, renting a modular system is usually more cost-effective than owning. Rental eliminates storage costs, system maintenance, and the risk that a purchased system goes out of graphic date. For exhibitors running three or more shows annually with a consistent brand footprint, purchasing a system that can be refreshed with new graphics tends to come out ahead over a two-to-three-year horizon. The calculation changes again for large island footprints, where rental fees per show can be substantial; get a full five-year cost model before deciding.

Ready when the venue is

LET'S BUILD THE PLAN

Contact Us